📚Design

Cara Akses
Login ke aplikasi menggunakan username dan password yang sudah diberikan

Buka Innovation Phase di sidebar.
Pilih inovasi yang ingin dikelola.
Masuk ke tab Design.

Approval Tahap 1 — OMTM & Hypothesis Lean Canvas
1) OMTM Agreement
Field yang diisi inovator:
OMTM Description (contoh: Solution Validated by Early Adopter).
Target (contoh:
10).Start Date – End Date.
Proposed Budget (opsional)
Detail Budget (link)
Timeplan (link).
Link wajib menggunakan
http://atauhttps://.

2) Hypothesis Lean Canvas — Design
Section yang diisi inovator:
Solution
UVP
Section Problem, Customer Segment, Existing Alternative, Early Adopter terkunci (sudah tervalidasi di Define).

Alur & status
Setelah OMTM & Hypothesis Lean Canvas terisi, Innovator ubah status jadi Ready to Review dan menunggu approval dari Innovation Manager

Jika status Design sudah ready to review Innovation Manager dapat memberi Komentar/Approve.

Approval Tahap 2 — Final Approval (Design)
3) Prototype Versioning
Field:
Version
Link Prototype
Keterangan
checkbox Validated Prototype?

4) Rekap Solution Interview
Fokus pada solusi/fitur (bukan problem)
Field:
Nama interviewee
Karakteristik early adopter
Tanggal
Top Solution/Feature (pilih dari Lean Canvas atau Free Text)
Rating (MUST HAVE / NICE TO HAVE / DON’T NEED)
Insight
Prototype Version (wajib dipilih)
Evidence (link audio/video
http://atauhttps://).

5) Kesimpulan Solution Interview (auto generate)
Aturan validasi:
Simulasi (mis. Target OMTM = 10)
Fungsi Dashboard
MUST HAVE
10
Yes
Fungsi Analisis & Evaluasi
MUST HAVE
10
Yes
Task
DON’T NEED
1
No
Upload Excel
NICE TO HAVE1
1
No
Fitur About
MUST HAVE
1
No
6) Validated Lean Canvas — Design
Update Lean Canvas sesuai hasil Solution Interview.
Pada fase Design hanya Solution & UVP yang dapat diubah.

7) Industrial Landscape
Upload diagram posisi inovasi menggunakan framework Gartner Magic Quadrant & tuliskan deskripsinya.


8) Mentoring Progress (Innovation Manager)
Field: Tipe mentoring, Tanggal, Judul, Pembahasan, Follow up, Evidence (link).
Input by Innovation Manager
Inovator view-only.

9) Additional Attachment
Upload dokumen pendukung (MVP, repo, arsitektur, dsb.).

Final Approval
Innovation Manager dapat melakukan Final Approval di fase Design dan memberikan komentar ditiap section

Last updated